Strawberrys Skys is finished with construction!  The project started by adding a new pitched roof gaining several feet in ceiling height.  To utilize this space the existing ceiling was cut out to expose the new truss roof above.  David Rochester of Technical Audio Services along with Strawberry Skys designed the new look and technical aspects of the room with Matthew Knight providing the carpentry work. The finished live room has sloping ceilings peaking out at 12 and a half feet and sloping down to 10 feet as well as custom bass traps, diffusion walls, and DMX lighting system.

Below is the journal of updates through  out the project, and a link to see the construction process.  Enjoy. 

 

                                        

 

07/09/2011 - Renovations are moving along at Strawberry Skys.  The framing for the new large ISO booth is complete, and the metal framing for the studio area has been installed.  Also this week finished up the installation of the HVAC work and electrical runs.  David Rochester from Technical Audio Services will be in next week to finish up designs for the next phase of the renovation project.  New pictures are up and more will come as we start insulation and drywall!

 

07/16/2011 - David Rochester of Technical Audio Services spent the past week working with the Strawberry Skys team to finalize plans for finishing the new studio design.  Insulation was installed and final metal framing was put in to get ready for sheet rock installation starting next week.  New pictures are up.  

 

7/29/2011 - All dry wall is up and the new studio area is taking form.  The floating floor has also been installed and is ready for the hardwood application next week.  Bass traps are currently being installed as well as diffusion.  It won't be long until the new room is up and ready for recording!  Check out the progress on construction picture page.

Keep posted as we will continue to update the website with the progress of the renovations. We look forward to showing everyone our new space and making even better recordings with all of you.

 

8/08/2011 - Progress continues as more and more projects get completed on the studio re-design.  All bass traps and wall diffusion panels have been installed as well as sofits built. Fabric  has been installed on the diffusion panels in the main room preparing them for wood slats to be added.  This week will see the wood flooring being completed as well as lighting.  Check out the new pics by clicking the link below.


09/12/2011- Well we are almost finished.  The main room has been completed as well as the drum booth.  The vocal booth will be finished this week and Strawberry Skys fill be back to fully operational.  We look forward to working with everyone in our new recording space.  I'm sure you will enjoy it as much as we will.  Professional pictures are coming soon.  For now we've added some updated pictures.

 

10/01/2011 - We are finally wrapping up renovations at Strawberry Skys!  The studio room is finished and looks amazing.  This week Matthew Knight finished up making gobos for the new room.  We look forward to having many years recording in our new live room and can't wait to work with all of you.  Professional photos of the new room will be up soon.  Check out our pictures of the gobos being built.

 

 